S&M Hardwood
S&M Hardwood
  • Home
  • Contact
  • Room Visualizer
  • Shop
  • Gallery
  • Blog
  • Brands
  • Care
  • Commercial
  • About
  • Employment
  • Pre Install
  • Post Install
  • Schedule a Sample Drop
  • Faq
  • More
    • Home
    • Contact
    • Room Visualizer
    • Shop
    • Gallery
    • Blog
    • Brands
    • Care
    • Commercial
    • About
    • Employment
    • Pre Install
    • Post Install
    • Schedule a Sample Drop
    • Faq
  • Sign In
  • Create Account

  • Orders
  • My Account
  • Signed in as:

  • filler@godaddy.com


  • Orders
  • My Account
  • Sign out

Signed in as:

filler@godaddy.com

  • Home
  • Contact
  • Room Visualizer
  • Shop
  • Gallery
  • Blog
  • Brands
  • Care
  • Commercial
  • About
  • Employment
  • Pre Install
  • Post Install
  • Schedule a Sample Drop
  • Faq

Account

  • Orders
  • My Account
  • Sign out

  • Sign In
  • Orders
  • My Account

Transform with S&M Hardwood

To ensure you're ready for installation, follow the tips below.

 

At S&M Hardwood, we treat your home with the same respect we treat a 15,000 sq. ft. commercial resort. To ensure your installation goes smoothly and stays on schedule, please review and complete this checklist before our crew arrives.

1. Climate Control (The "Florida Rule")

  • [ ] AC is On: Your HVAC system must be operational and set between 65°F and 75°F for at least 48 hours prior to installation.
  • [ ] Acclimation: If we delivered your wood or LVP early, do not move it. It needs to "breathe" in the environment where it will be installed.

2. Room Preparation

  • [ ] Clear the Floor: Remove all small items, "knick-knacks," and breakables from the tops of furniture and the floor. remove items from under beds and empty drawers of breakable items. 
  • [ ] Closets & Storage: Please clear the floors of all closets receiving new flooring.
  • [ ] Electronics: Disconnect all computers, TVs, and surround sound systems. (Our crews are masters of flooring, but we aren't IT experts!)

3. Appliances & Furniture

  • [ ] Appliances: Gas appliances must be disconnected by a certified plumber. For refrigerators, please ensure the water line is disconnected.
  • [ ] Furniture Moving: If you have opted for our furniture moving service, please ensure all dresser drawers and cabinets are empty.

4. Safety & Access

  • [ ] The "Paw" Protocol: For the safety of our crew and your furry friends, please ensure pets are secured in a room not receiving flooring or off-site for the day.
  • [ ] Power & Water: Please ensure we have access to functional electrical outlets and a water source.
  • [ ] Point of Contact: Ensure a decision-maker (18+) is present at the start of the job to confirm the layout and transition plan.


 

Why These Steps Matter for Your Warranty

When you choose a premium product like the Parkay Floors XPL Organics Honey, the installation environment is critical. Following this checklist ensures the Registered Embossed planks lay perfectly flat and the locking mechanisms perform as engineered for a lifetime of use.

For our commercial partners, this checklist is even more vital. Large-scale glue-down projects require precise temperature controls to ensure the adhesive bonds permanently to the slab.


The S&M "Gold Standard" Promise

Our crew will perform a Pre-Start Walkthrough with you to verify the subfloor condition and transition points. If we find anything that doesn't meet our standards, we’ll discuss the solution before we proceed with the installation. 

We love our wood floors ! 

  • Home
  • Return Policy
  • Terms of Service
  • Contact
  • Room Visualizer
  • Shop
  • Gallery
  • Blog
  • Brands
  • Care
  • About
  • Warranty
  • Employment
  • Pre Install
  • Post Install
  • Schedule a Sample Drop
  • Faq

S&M Hardwood

727-687-8307

Copyright © 2026 S&M Hardwood - All Rights Reserved.

Powered by

This website uses cookies.

We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

Accept